Director: Adrian De Sa Garces
POST: Blackginger

One of the several sets we created in 3D to help with blocking and save time and money on things like flooring and construction of walls and returns.  We actually create and rig a 3D crane so the movements match what can be done on set.  We also setup the camera and lensing exactly the same as the gear on set so framing is identical.
Back to Top